Advanced wind technology

Nabrawind makes wind projects easier.

We design and industrialise tower, foundation, installation and maintenance technologies that make wind turbines easier to transport, build and service.

Speak to the team

Bigger turbines. Bigger challenges.

Larger turbines can capture more energy. But getting them to site, building the foundations and installing them can add cost, delay and complexity.

Remote locations bring further challenges, from difficult roads and ground conditions to limited access to infrastructure and equipment.

Nabrawind technology is designed to mitigate those constraints.

Nabrawind technology

  • Nabrabase

    Simple foundations, no matter the soil. A versatile foundation solution that reduces installation time, material use, costs and emissions across all ground conditions.

  • Nabralift

    Unlocking new heights, driving down levelised cost of energy. Enabling hub heights beyond 200 meters to increase energy output while overcoming crane and logistics constraints.

  • Skylift

    Crane-less installation in strong wind areas. A reliable system for installing the complete wind turbine in winds of up to 15m/s, at a rate of one turbine per week.

  • Bladerunner

    The simplest crane-less blade installation ever. A fast, cost-effective system for installing and replacing blades safely in winds of up to 12m/s.

Nullagine: Wind built for the Pilbara

Fortescue’s Nullagine Wind Project will combine 17 Envision wind turbines with Nabrawind’s self-erecting tower technology.

The 133 MW project will use 188-metre Nabralift towers.

The project is putting a different approach to wind construction into one of the world’s most remote operating environments.

It will help demonstrate how modular tower technology can support the delivery of large-scale renewable power where transport, access and installation all add complexity. 

Have a wind project to discuss?

Want more wind, but less cost and complexity? 